Commercial Production Guide

Downtime: Log It, Don't Guess It

Downtime is the machine's unused hours, and it leaks capacity silently because nobody writes it down. This guide defines the downtime categories, explains why logging beats guessing, and provides a printable blank log with date, machine, duration, category, cause and action.

Category: Downtime & Maintenance

Print the blank log and keep it at the machine. Fill one row per downtime event; keep categories consistent so monthly totals mean something.

Frequently Asked Questions

How detailed should a downtime entry be?

Brief but complete: date, machine, duration, category, one-line cause and the action taken. Detail enough to reconstruct the event, short enough that it actually gets filled.

Should scheduled cleaning count as downtime?

If the machine is not producing, the hours are not producing. Category them as cleaning and let the review decide whether the cleaning time is reasonable for the products run.

What if downtime is rarely logged?

Start with one sign on the machine and a one-minute habit: fill the line as the event ends. A partial log is still more honest than no log.

Key Takeaways

  • Categorize downtime: maintenance, pump, refrigeration, cleaning, power, scheduling, supply shortage.
  • Log date, machine, duration, category, cause and action; guessing underestimates the loss.
  • Review monthly totals by category and feed the hours into capacity and utilization math.