Raw Material Planning: Sourcing for Dry Output

Raw material planning answers the sourcing question: how much fresh product must come in to deliver a target dry output? The core estimate divides the production target by the expected dry yield, and keeps trimming and waste in a separate, visible line so nothing hides the real purchase quantity.

Category: Production Planning

Frequently Asked Questions

Why do I need more fresh product than the yield math says?

Because yield math covers water loss only after preparation. Trimming, peeling, cooking loss and damaged product consume fresh weight before the dryer sees it; that line must be planned separately.

What is the most honest way to set the yield?

Use a tested yield for that product and preparation, a customer's historical yield, or a labeled assumption, in that order of preference. Then revise with your own measured batches.

Should I plan for seasonal price swings?

Yes. Sourcing plans that assume one price all year drift badly in seasonal markets; the [[fruit production guide|/commercial/fruit-production/]] covers seasonality for fruit lines specifically.

Key Takeaways

  • Fresh sourcing estimate = production target ÷ expected dry yield, plus a separate waste line.
  • Keep yield and waste in separate lines so buying is explainable and improvable.
  • Label assumptions; sourcing on invented yields costs money in both directions.