Commercial Production Guide

Cost per Package

Cost per package is the number every retail price must clear: the share of batch product in the package, plus the bag, the absorber, the label, the packaging labor and a share of loss. Add an overhead allocation only if your pricing includes overhead at the package level.

Category: Costing

Frequently Asked Questions

Should packaging loss be in the cost per package?

Yes, if pricing is meant to cover the whole run: the packages that fail still cost money, and that cost must be carried by the packages that sell. The [[production losses guide|/commercial/production-losses/]] covers the categories.

How do I cost the label?

Take the label purchase price, add any print setup, and divide by the number of labels in the order for a per-label value. Small runs make labels surprisingly expensive per package.

Is overhead per package required?

No. It is optional but should be deliberate: either allocate it consistently per package or cover it through markup. Ignoring it is the option that loses money.

Key Takeaways

  • Cost per package = product share + bag + absorber + label + packaging labor + loss share, plus overhead only if you allocate it.
  • Packaging cost concentrates in small packages, so package size is a costing decision.
  • The Cost per Package calculator computes it from your own totals and add-ons.

Related Guides

Continue through the Commercial Production Center with these related guides.